5.5.3 Tacoma M&I Metrics Screen

Figure 5.27 displays the Tacoma M&I Metrics screen. This screen provides the viewer with information about M&I demands and supply sources, M&I reliability, and shortfall durations.

Figure 5.27 Tacoma M&I Metrics Screen

 

 

Navigation Buttons:

 

Input Screens

 
 

Tacoma Control Panel

 

Tacoma Advanced Control Panel

 

Regional Control Panel

Output Screens

 
 

Conservation/Curtailment

 

Conservation/Curtailment

 

Green River Metrics

 

Groundwater Metrics

 

HAH Reservoir

 

Pipeline 5 Deliveries

 

TSI

 

Output Information:

 

Average Shortfall

Average volume, in mgd, not delivered.

Cumulative Shortfall

Total cumulative volume, in mg, not delivered.

M&I Annual Reliability

Percentage of M&I failures over total years of model run.

M&I Weekly Reliability

Percentage of M&I failures over total weeks of model run.

Maximum Shortfall Duration

Maximum number of consecutive weeks there is a M&I shortfall.

Maximum Yield

Represents the maximum annual yield, in mgd, of the system.

Number of Failure Years

Number of years there is a M&I shortfall.

Total Weeks Failure

Total number of weeks of the model run in which there is a M&I shortfall.

Graph:

 

Supply Sources, mgd

This graph illustrates how projected demand is met. The graph represents total demand, in mgd, separated by sources utilized to meet given demand, over hydrologic years. Tacoma sources shown: HAH Reservoir M&I Release (Pipeline 1 and 5), and Groundwater M&I.

 