CRYSTAL User Interface 5.5.1
HAH Reservoir 5.5.2
Green River Metrics 5.5.4
Tacoma Conservation/Curtailment 5.5.5
Groundwater Metrics 5.5.6
Pipeline 5/Second Supply Project 5.5.7
Tacoma-Seattle Intertie
5.5.3 Tacoma M&I Metrics Screen
Figure 5.27 displays the Tacoma M&I Metrics screen. This
screen provides the viewer with information about M&I demands and supply
sources, M&I reliability, and shortfall durations.

Figure 5.27
Tacoma M&I Metrics Screen
|
Navigation Buttons: |
|
|
Input Screens |
|
| |
Tacoma Control Panel |
| |
Tacoma Advanced Control Panel |
| |
Regional Control Panel |
|
Output Screens |
|
| |
Conservation/Curtailment |
| |
Conservation/Curtailment |
| |
Green River Metrics |
| |
Groundwater Metrics |
| |
HAH Reservoir |
| |
Pipeline 5 Deliveries |
| |
TSI |
|
Output Information: |
|
|
Average Shortfall |
Average volume, in mgd, not
delivered. |
|
Cumulative Shortfall |
Total cumulative volume, in mg,
not delivered. |
|
M&I Annual Reliability |
Percentage of M&I failures
over total years of model run. |
|
M&I Weekly Reliability |
Percentage of M&I failures
over total weeks of model run. |
|
Maximum Shortfall Duration |
Maximum number of consecutive
weeks there is a M&I shortfall. |
|
Maximum Yield |
Represents the maximum annual
yield, in mgd, of the system. |
|
Number of Failure Years |
Number of years there is a
M&I shortfall. |
|
Total Weeks Failure |
Total number of weeks of the
model run in which there is a M&I shortfall. |
|
Graph: |
|
|
Supply Sources, mgd |
This graph illustrates how
projected demand is met. The graph represents total demand, in mgd,
separated by sources utilized to meet given demand, over hydrologic years.
Tacoma sources shown: HAH Reservoir M&I Release (Pipeline 1 and 5),
and Groundwater M&I. |