5  CRYSTAL User Interface    5.2.1  Regional Control Panel    5.2.2  Everett Control Panel    5.2.3  Seattle Control Panel    5.2.5  Tacoma Control Panel    5.2.6  Tacoma Advanced Control Panel

 

5.2.4  Seattle Advanced Control Panel

Figure 5.8 displays the Seattle Advanced Control Panel. This screen provides the user with the opportunity to choose input, such as Tolt Filtration Plant activation, that will effect the Seattle Supply System and links to other components of the model.

 

Figure 5.8 Seattle Advanced Control Panel

 

 

Navigation Buttons:

 

Information Screens

 

 

Documentation

Input Screens

 

 

Regional Control Panel

 

Seattle Control Panel

Output Screens

 

 

Cedar Reservoir

 

Cedar River

 

Lake Washington

 

Seattle M&I

 

Tolt Reservoir

 

Tolt River

 

Total Storage

 

TSI

 

Input Options:

 

Pump Cedar Dead Storage

This option allows pumping of Chester Morse Reservoir. Without pumping, dead storage is reached at the elevation of 1532 feet. Pumping allows drawdown to 1517 feet.

Pump to 30' Drawdown

This option, which may be activated along with the "Pump Cedar Dead Storage" option, increases drawdown of Cedar Reservoir to 1502 feet.

Tolt Filtration Plant Options:

 

 

No Tolt Filtration Plant

 

Baseline, 1710 ft

Elevation 1690

Elevation 1660

This set of options allows the user to incorporate the Tolt Filtration Plant into the simulation or exclude the plant.

 

The user has the option to not include the filtration plant.

 

The user may include the filtration plant by choosing one of the dead storage elevation options available (1710, 1690, and 1660).

Tolt Pipeline II

This option implements the addition of the Tolt Pipeline II, which has a capacity of 120 mgd.

Tolt Relies on Cedar

With this option selected, flows in the Cedar and storage in Chester Morse Lake determine critical fish flows. With this option unselected, the two rivers are treated independently by the model. Critical flows in the Tolt River will then be determined by Tolt flows and storage.

 

Output Fields:

 

Activate HCP

A check symbol indicates that the Cedar River HCP has been activated. This HCP may be chosen in the Regional Control Panel.

 

Table of Contents