|
|
7.3.2 Seattle Evaluation 7.3.3 Tacoma Evaluation
7.3.1 Scenario EvaluationThe following discussion presents an evaluation of both of the scenarios and their results. The model was run over the period of week 66 through 3353. This period was selected in the simulation set up menu. The model evaluation does not include comprehensive coverage of all of the results generated by running the model, but covers some of the more important metrics, with respect to M&I reliability and streamflow conditions. Metrics Evaluated T presents a summary of the metrics which will be discussed and their location within the user interface. Table 7.2 Metrics Summary
Table of Contents 7.1 Status Quo 7.2 Imminent Supply
|