7.3.2  Seattle Evaluation    7.3.3  Tacoma Evaluation

 

7.3.1  Scenario Evaluation

The following discussion presents an evaluation of both of the scenarios and their results. The model was run over the period of week 66 through 3353. This period was selected in the simulation set up menu. The model evaluation does not include comprehensive coverage of all of the results generated by running the model, but covers some of the more important metrics, with respect to M&I reliability and streamflow conditions.

Metrics Evaluated

T  presents a summary of the metrics which will be discussed and their location within the user interface.

Table 7.2  Metrics Summary

Metric

Location

Seattle: Weekly Reliability

Seattle M&I Metrics

Seattle: Annual Reliability

Seattle M&I Metrics

Seattle Total M&I Shortfall

Seattle M&I Metrics

Seattle M&I Average Shortfall

Seattle M&I Metrics

Tolt River - Volume Above Minimum Flow Requirements

Tolt River Metrics

Tolt River - Percent of Time Above Flow Requirements

Tolt River Metrics

Cedar River - Volume Above Minimum Flow Requirements

Cedar River Metrics

Cedar River - Percent of Time Above Minimum flow Requirements

Cedar River Metrics

Tacoma Weekly M&I Reliability

Tacoma M&I Metrics

Tacoma M&I Annual Reliability

Tacoma M&I Metrics

Tacoma M&I Average Shortfall Volume

Tacoma M&I Metrics

Green River - Average Flow at Auburn Gauge

Green River Metrics

Green River - Annual Average Above Minimum Flows at Auburn Gauge

Green River Metrics

Green River - Annual Average Above Minimum Flow Requirements at Palmer Gauge

Green River Metrics

 

Table of Contents    7.1  Status Quo    7.2  Imminent Supply