5
CRYSTAL User Interface 5.2.2
Everett Control Panel 5.2.3
Seattle Control Panel 5.2.4
Seattle Advanced Control Panel 5.2.5
Tacoma Control Panel 5.2.6
Tacoma Advanced Control Panel
5.2.1 Regional Control Panel
A regional control panel, shown in
Figure 5.6, provides links to each of the system control panels and the ability
to set input which affects model on a regional scale, such as year of
investigation. More information about these options may be found in model
description and documentation sections.

Figure
5.6 Regional Control Panel
|
Navigation Buttons: |
|
|
Information Screens |
|
| |
CRYSTAL Title Page |
|
Input Screens |
|
| |
Everett Control Panel |
| |
Seattle Advanced Control |
| |
Seattle Control Panel |
| |
Tacoma Advanced Control Panel |
| |
Tacoma Control Panel |
|
Input Options: |
|
|
Cedar River Habitat Conservation Plan |
Activating the Cedar River HCP will
instigate the Instream Flow Agreement, which creates binding instream
flow requirements on the Cedar River, measured at Landsburg. |
|
Green River Habitat Conservation Plan
(HCP) |
When this HCP is activated, it incorporates the following into the
model:
- Muckleshoot Indian Tribe (MIT) Agreement provisions:
- Larger baseflows at Palmer.
- Reflect seasonal flexibility at Auburn.
- Higher baseflow targets at Auburn.
- Freshet release during the spring.
- Secondary Water Right withdrawal restrictions in low flow
conditions.
|
|
HAH Expansion/Second Supply Project |
This field may be checked to activate Phase
I of the Tacoma Second Supply Project. Phase I expands HAH capacity by
25,000 ac-ft to a storage of 50,400 ac-ft (approximate stage elevation
of 1,167 ft). 20,000 ac-ft of the increased storage is allocated for
municipal water supply and will be stored during the spring to be
released during summer and fall. The remaining 5,000 ac-ft is allocated
for low flow augmentation to benefit fish habitat. The supply project
also includes the completion of the Tacoma-Seattle Intertie project.
This option also activates Pipeline No. 5, which will distribute the
additional water supply. |
|
Year of Investigation |
This field determines the demand load on the water supply used in the
model simulation. The user inputs a Year of Investigation ranging
between 1994 and 2040. The Year of Investigation may be input only in
the Regional Control Panel. This field may be viewed on other screens,
but these fields are "dummy" versions that do not allow input
and are for the user's information only. |
Note: The model will more accurately reflect the system if the Secondary
Supply Project and Green River HCP are implemented together.
Table