|
|
8. Model Description 8.1.1 Everett Water Supply System 8.1.2 Reservoir Operations 8.1.3 Instream Flow Requirements 8.4.1 Demands 8.1.5 Conservation 8.1.6 Everett Future Sources 8.1.7 Everett Hydrologic DataSnohomish County PUD No. 1 (SnoPUD) developed 100 years of daily streamflow data for a model of the Jackson Hydroelectric Project (JKSOPR). This data was converted to weekly values and used in the CRYSTAL model. There are four inflow points, shown in used in the model, and they are tabulated below (Table 8.3). Table 8.4 Inflow Locations for the CRYSTAL Model
Figure 8.7 Everett Inflow Locations
Table of Contents 8.2.1 Overall Seattle Operations 8.3.1 Overall Tacoma Operations
|