Figure 5.7 displays the Everett Control
Panel. This screen provides the user with the opportunity to choose input that
will effect the Everett Water Supply System, such as demand increases, and links
to other components of the model.

Figure 5.7 Everett Control Panel
|
Navigation Buttons: |
|
|
Information Screens |
|
| |
Everett Pictures |
| |
Everett Title page |
|
Input Screens |
|
| |
Regional Control Panel |
|
Output Screens |
|
| |
Everett M&I Metrics |
| |
Jackson Power Plant Metrics |
| |
Lake Chaplain Metrics |
| |
Spada River Metrics |
| |
Sultan River Metrics |
| |
Sultan River Metrics (continued) |
|
Input Options: |
|
|
% Increase in Demands |
|
|
Ebey Slough Demand, mgd |
|
|
Install Bev Park Wells |
|
|
Weyerhaueser Right |
|
|
Output Fields: |
|
|
Base M&I Demand (mgd) |
This field displays Everett's daily municipal and industrial demand
in million gallons per day. |
|
Year of Investigation |
This field displays the Year of Investigation entered into the
Regional Control Panel. |